Finally, it's up :)
16'th march we released the project I've been managing for the last months, a complete rewrite of what's probably the biggest poker community around today. 100% OOP/PHP multi-tier architecture, a super sweet db-design that purrs like a cat with 100 selects/sec and 15-20 inserts/updates/deletes/sec...
It's the work of 3 ServerSide coders, 1 dba, a designer and a template maker and little 'ole me + some assorted help. 2,5 months designing & coding plus a lot of planning and here it is :
Pokah! PokerRoom.com
Whoo :)
/Dan
Thursday, March 24, 2005
Thursday, March 03, 2005
AMP (Apache/MySQL/PHP) on USB.
I've been thinking of getting a small, working portable development enviroment up and running for a while now. Something that I could take with me and use on what ever PC I was at for the moment. What I didn't want to do was to install the whole package on a PC that wasn't mine so I started thinking of using an USB stick.
After reading a short tutorial over at firepages where he described getting PHP5, Apache and MySQL onto USB I got to work.
After a lot of hacking and cursing around problems with not using the drive letters in php.ini and httpd.conf I decided to try a ready made package:
I went with xampp lite, an appr 50Mb large package that can be found here:
http://www.apachefriends.org/download.php?xampplite-win32-1.4.12-pl1.exe
I unpacked the zip through the downloaded .exe into a folder on the desktop, copied the folder xampplite to the root of the USB, entered the folder and clicked xampp_start.exe
Whoops... a complete WAMP install on usb that works...
This install offers quite a lot, phpmyadmin for example so I uploaded my CMS-beta, loaded the db and started...
It works! Smarty and everyting :)
I'm using a 128 Mb USB 2 memory stick and that's probably minimum if it should be usable.
Now, what are you waiting for... Go try it :)
/Dan
I've been thinking of getting a small, working portable development enviroment up and running for a while now. Something that I could take with me and use on what ever PC I was at for the moment. What I didn't want to do was to install the whole package on a PC that wasn't mine so I started thinking of using an USB stick.
After reading a short tutorial over at firepages where he described getting PHP5, Apache and MySQL onto USB I got to work.
After a lot of hacking and cursing around problems with not using the drive letters in php.ini and httpd.conf I decided to try a ready made package:
I went with xampp lite, an appr 50Mb large package that can be found here:
http://www.apachefriends.org/download.php?xampplite-win32-1.4.12-pl1.exe
I unpacked the zip through the downloaded .exe into a folder on the desktop, copied the folder xampplite to the root of the USB, entered the folder and clicked xampp_start.exe
Whoops... a complete WAMP install on usb that works...
This install offers quite a lot, phpmyadmin for example so I uploaded my CMS-beta, loaded the db and started...
It works! Smarty and everyting :)
I'm using a 128 Mb USB 2 memory stick and that's probably minimum if it should be usable.
Now, what are you waiting for... Go try it :)
/Dan
Subscribe to:
Comments (Atom)