Well, this has been an interesting experience to say the least.
I've learned tons and had fun and frustrating moments.
A Summary:
I used debianpure from http://www.debianpure.com/ which basically is a simplified way to get a "real" Debian install up and running with the normal packages (visual, audio, web, dev, office etc) that a normal user needs.
It starts out with basic setup and partitioning etc which was easy to understand, as you get to the apt-part of the install you stop the basic installation and reboot. As root you then run 1 of 4 different sh-scripts (gnome from cd, kde from cd, gnome from net, kde from net), these scripts retrieve the needed packages and installs them.
After another reboot you get to configure screen, sound etc which also worked just fine.
After that you are up and running! Nice package indeed.
Needless to say I've had some problems, but these where 95% me using a notoriously bad wireless card for Linux, had I used a std ethernet card I'm sure it would have been a breeze.
The last 5% of trouble was the fact that all paths in the sh-scripts has hardcoded paths starting with /media/cdrom/ As I had one dvd-drive and one cd-drive mine where labeled cdrom1 and cdrom2... Doh, none of the scripts worked.
Not knowing if/how you could rename these in bash I went to my trusted mac, copied all content from the CD, altered the scripts and burned a new .iso
After that it all worked.
For the wireless card (D-Link DWL-510 11Mbps PCI card), this is what I found out:
The ndiswrapper worked with the std windows dlink-drivers as described in the FAQ at debianpure, however the /etc/network/interfaces needed to have the correct "wireless_channel
At some points during the install in bash, the system will lag and not echo your input at the prompt, it comes back without you doing anything though.
There is one more snag, the card refuses to start on boot, it needs an su
At this point I havn't enabled WEP yet, I've heard that there might be problems with the 128 bit encryption and that you might need to set a lower level, havn't confirmed that yet though.
All in all, basically a nice way to get up with Debian 3.1 Sarge using kernel 2.6.8x.
If you unlike me have a clue when you start, you'll have an easy time with it.
Cheers/Dan
No comments:
Post a Comment